Commercial warehouse with solar panels
Back to Home

Commercial Solar Division

Energy Is a Business Decision.

A site-specific analysis of how converting your facility to solar may reduce operating costs, lock in predictable energy pricing, and build long-term financial value.

Potential Energy Cost Reduction

Depends on your consumption profile, rate schedule, system design and project-specific analysis

Project-Specific Payback

Depends on costs, consumption, utility rates, incentives and financing terms

Long-Term Warranty Options

Terms vary by manufacturer, equipment, installer and financing provider

All figures are illustrative estimates. Final numbers are confirmed once we review your actual FPL utility data and conduct a site assessment.

Request a Commercial Energy Analysis

The Problem

Utility Costs Can Change Over Time

Commercial electricity costs are influenced by utility rate schedules, regulatory decisions, demand patterns and facility usage. Because future rates cannot be predicted with certainty, energy strategies should be evaluated using multiple scenarios rather than a single assumed escalation rate.

Solar Power MIA models project economics using facility-specific data and clearly identified assumptions.

Why This Makes Sense Financially

Six Reasons Beyond the Monthly Bill

Most people think solar is just about lowering the utility bill. That's only part of the story. Here's what else changes when you own a solar system.

Understanding Demand Charges

For many commercial rate schedules, demand charges are based on a facility's maximum measured demand during the billing period. The applicable calculation depends on the customer's utility rate schedule and load profile. Solar and battery storage may reduce demand charges when system production or stored energy coincides with a facility's peak demand. Results depend on the facility's load profile, system design and applicable rate schedule.

Demand charges can be an important component of commercial energy costs and should be evaluated as part of a project-specific analysis.

Net-Metering Considerations

Excess generation may be credited in accordance with FPL's applicable net-metering tariff and interconnection rules. Eligibility, credit treatment, system sizing requirements and other terms are subject to the applicable utility rules and may change. Project-specific interconnection and rate-schedule review is required.

Subject to FPL's applicable net-metering tariff.

Owned Asset on Your Balance Sheet

A solar system is commercial property that may sit on your balance sheet as a capital asset and may be eligible for depreciation-related tax benefits, subject to applicable tax rules. It may also influence the appraised value of your building.

May add value to the property itself

Potential Property Value Considerations

Commercial properties with solar systems may appraise higher than comparable properties without them. The system typically transfers with the property and may be factored into the sale price. Property-value effects are not guaranteed and depend on market conditions, ownership structure, system characteristics and appraisal methodology.

May increase what the building is worth at exit

Fixed, Predictable Energy Costs

Utility rates are set by the utility and can change over time. Solar can help convert a portion of your energy cost from variable to more predictable, which may support budgeting and long-term financial planning.

Helps remove utility rate risk from your P&L

Financing Options Available

If you prefer not to use cash or standard financing, various loan programs may be applied to commercial solar projects. Many businesses can potentially go solar with little to no upfront capital.

Potential for positive cash flow, depending on financing structure

Federal Tax Incentives

Potential Tax Incentives

Commercial solar projects may qualify for federal tax incentives that can affect overall project economics. Availability, eligibility and value depend on project-specific and taxpayer-specific factors.

Source: IRS

Potential Federal Clean-Energy Credits

Federal clean-energy investment tax credits may be available. Credit amounts and eligibility depend on project-specific requirements and applicable federal rules.

Potential Depreciation Benefits

Qualifying commercial energy projects may be eligible for depreciation-related tax benefits, subject to applicable tax rules and the client's individual circumstances.

Project-Specific Tax Strategy

Available incentives can materially affect project economics, but eligibility, timing and value vary by project and taxpayer.

Solar Power MIA does not provide tax, accounting or legal advice. Tax incentives, depreciation benefits and eligibility requirements may change. Clients should consult their own qualified tax, accounting and legal professionals before making tax-related decisions.

How to Pay for It

Four Financing Paths to Evaluate

StructureUpfront CostTax BenefitsYear 1 Cash FlowBest For
Cash PurchaseFull system costPotentially availablePotential for Strong Long-Term ValueStrong cash position, max return
Loan FinancingLittle to nonePotentially availablePotentially positive immediatelyPreserve liquidity, own asset
SBA LoanMinimal / flexiblePotentially availablePotentially positive immediatelyGov-backed financing
PPA / LeaseNonePassed to providerPotentially positive immediatelyPotential No-Upfront-Capital Option

Availability and eligibility depend on the applicable third-party provider, customer qualification, project structure and contractual terms. Solar Power MIA is not a lender. Financing, lease and PPA options are provided by applicable third-party providers and are subject to their eligibility requirements, qualifications and contractual terms. For potential tax benefits, eligibility and treatment depend on ownership/financing structure and applicable tax rules. Solar Power MIA does not provide tax advice.

Risk & Protection

Long-Term Protection. Minimal Operational Burden.

Up to 25 Years

Manufacturer Warranty Options

Terms depend on the equipment and manufacturer selected.

Warranty Options

Inverter Equipment Coverage

Coverage terms and periods vary by manufacturer and equipment selected.

24/7

Remote Performance Monitoring

Availability and features depend on the monitoring platform and equipment selected.

O&M

Coverage options with minimal day-to-day staff involvement; scope and availability depend on the applicable provider and project agreement

Implementation

Typical Project Timeline: From Concept to Power in Under 6 Months

1

Utility Data Review & Design

Weeks 1–2

We review your FPL data, confirm roof dimensions and condition, and produce a custom system design sized to your actual load.

2

Permitting & Approvals

Weeks 3–8

We handle all permit applications and coordinate any required approvals. This window is driven by municipality and utility timelines.

3

Installation

Weeks 6–12

Crew installs panels, racking, inverters, and electrical connection. Most commercial installations complete in 5–10 business days.

4

FPL Interconnection

Weeks 10–20

FPL inspects and approves the connection. Once approved, the system pushes power to the grid and net metering begins.

5

System Live

Month 4–6

System is commissioned, monitoring is active, and your first bill reflecting solar production arrives.

Timelines are estimates and may vary depending on project complexity, permitting, utility review, inspections, interconnection requirements and other third-party approvals.

Next Steps

Let's Move This Forward

Three actions between now and a formal proposal with your exact numbers:

1

Share Your FPL Bill

12 months of billing history lets us model your actual usage, identify demand charges, and size the system correctly.

2

Confirm Roof Ownership & Access

We need to confirm that the roof is available for installation. For condo or shared property situations, we can help coordinate.

3

Site Walk & Final Proposal

We visit your facility, confirm structural and electrical conditions, and deliver a detailed proposal with system size, estimated cost, projected savings, and payback timeline.